ZF Transmissions – Gray Court, SC

ESI Group was selected to design; supply and construct an 18,777 square foot rack supported fully automated Automated Storage and Retrieval System (AS/RS) warehouse.  The facility’s storage capacity is 6,321 pallets of 2,000 pounds of work in progress transmission parts stored 11 levels high.

Project portfolio:

  • Building dimensions are 250 feet long by 72 feet wide and 73 feet tall
  • 3 – S/R Machines running in 3 aisles storing 2 pallets deep
  • New addition took 7 months to complete
  • The total size of this facility is 966,414 square feet

Design elements:

  • Construction  – Rack supported
  • Wall construction – Metal Skin with Batt insulation
  • Roof construction – TPO mechanically anchored
  • Fire protection – FM global in rack sprinklers