Critically Controlled Logistics Center


Grifols – Clayton / North Carolina
Project category: Automation
Project status: Completed
ESI Group was selected to build an 83,500 square foot extreme climate controlled –35-degree Celsius plasma storage center for Grifols pharmaceuticals. The facility is an Automated Storage and Retrieval System—rack supported structure utilizing three AS/RS SR Machines and is 90 feet tall. This critically controlled tempered space is refrigerated with a double redundant R507 refrigeration system with a nitrogen back-up.
The new plasma center is located on Grifols Clayton NC Campus and is a vital cold storage facility supporting their largest U.S. manufacturing site.
Imagery by Xfinigen Media Production Group
This project received a Gold through ABC’s Projects of Distinction Program.